• November 7, 2024
9 / 100

LOT PREPARATION METHOD

                  LOT PREPARATION METHOD

Knit Fabric

  1. Prepare a list as below
Lot No. Party Grey GSM 
Required GSM Required WIDTH Grey Width 
Roll NoRoll weightRoll LengthNo. of Hole/Big cutNo. of handling stainOther
      
Open chat
Hello
Can we help you?
Exit mobile version